Fueling Installation / On-site Fuel Storage
Beard Oil features an assortment of light product fueling Installations for the
distribution of gas and diesel to cater to the construction industry.
Recently Beard Oil has had every piece of dispensing equipment totally renovated
meaning all new plumbing, paint, required DOT maintenance and inspected.
In addition many new 22,000 gallon units have been implemented or are presently in
production. Beard Oil has made an enormous financial commitment to the construction
industry that has shown to be needed and appreciated.
These units are equipped with high volume pumps dispensing filtered product at
approximately 12-15 gallons per minute through each hose, four being gasoline and four
clear diesel. The off road diesel is also dispensed through a filtered system at
approximately 85 gallons per minute. These volumes speed up the fueling process saving
time and money each day the crews come and go. All of our tanks meet UL142
specifications meaning they will meet any township or state requirements for a
temporary fueling installation. Beard Oils installation crews are able to set up and
fuel or tear down locations in approximately 3-4 hours. Our tractors are equipped with
generators and all necessary equipment to test out all pumps and dispensing equipment
prior to leaving the site. This insures the contractors an immediate safe supply of
products at the time the electricians install the electrical source.